Risk calculation
Impact x Likelihood = Score
Impact and likelihood are scored from 1 to 5. Original risk is before treatment; residual risk is after current or planned controls.
Impact
1-5
x
Likelihood
1-5
=
Score
1-25
- Minor
- 1-4
- Moderate
- 5-9
- Major
- 10-15
- Critical
- 16-25
Risk Overview
Review original risk rating, treatment progress, and residual position
Certification Readiness
Workspace progress
Control Themes
Implemented controls by Annex A theme
Priority Queue
Upcoming reviews, missing evidence, and elevated risks
Document Library
0 documents shown
| Document | SharePoint Link | Category | Status | Owner | Next Review | Notes |
|---|
Calculation
Score = Impact x Likelihood
Original risk is assessed before treatment. Residual risk is assessed after current or planned controls.
- Minor
- 1-4
- Moderate
- 5-9
- Major
- 10-15
- Critical
- 16-25
Register
0 risks shown
| Ref | Risk Title | Asset | Status | Original | Residual | Treatment |
|---|
Risk Detail
Saved locally
Controls & Statement of Applicability
0 controls shown
| Control | Theme | Applicable | Implementation | Owner | Linked Evidence | Reason |
|---|
Evidence Tracker
0 evidence items shown
| Evidence | Area | Status | Owner | Due | Notes |
|---|
Certification Roadmap
0 stages shown